Technology May 21, 2022 11:24 AM (GMT+8) · EqualOcean
The general office of Zhejiang provincial government recently issued the "14th five year plan" for energy development in Zhejiang Province. According to the plan, by 2025, significant progress will be made in the construction of modern energy system, and the security of energy supply will be strong, laying a solid foundation for the province to achieve carbon peak. The province's comprehensive energy production capacity reached about 43.77 million tons of standard coal (all non fossil energy), and the energy self-sufficiency rate increased to about 15%. The installed capacity of electricity in the province reached about 137 million kilowatts, and the consumption of natural gas reached about 31.5 billion cubic meters. The province's energy reserve system has been further optimized. The storage capacity of coal, oil and gas has reached 120 million tons of standard coal, and the energy emergency reserve capacity meets the demand for high-quality supply. The peak load cutting capacity of power peak load reaches more than 5% of the maximum power load of 124.3 million KW. Implement the "scenery doubling" project: during the 14th Five Year Plan period, the installed capacity of new offshore wind power and photovoltaic in the province doubled, and the increment was ensured to reach 17 million kilowatts. The new installed capacity of photovoltaic is more than 12.45 million KW, and strive to reach 15 million KW.